Contractor fined for Liberty Bridge fire and closure

RabbleVID producer Mike Asti reports live regarding the $3M+ fine assessed to the Joseph B. Frank contractor company for the fire on the Liberty Bridge. The Liberty Bridge was shut down for three weeks due to the fire caused by the contractor.

Leave a Reply